Planning, Zoning and Hazardous Liquids Pipelines Posted: November 20, 2013
One question that has been asked by a number of local governmental officials in Kentucky counties where a hazardous liquids pipeline intended to transport natural gas liquids from the Marcellus and Utica shale formations to the Gulf has been proposed, is the extent to which local governments may, pursuant to their planning and zoning powers under KRS Chapter 100, regulate the location of such pipelines in order to assure compatibility of that land use with other uses of land.
This briefing paper presents some background concerning applicable state and federal law, in order to help inform the deliberations of local planning and zoning agencies. It is not intended to provide legal advice, and planners and local government officials are encouraged to consult with legal counsel in developing or amending zoning ordinances and comprehensive land use plans to address new and existing hazardous liquids pipelines.
As noted by the federal Office of Pipeline Safety in a 2010 report on pipeline risk and local development planning, the risks associated with hazardous liquids pipelines are different than the risks of natural gas pipelines, which the report characterizes as a ?primarily acute hazard that dissipates in the absence of an ignition source.
Hazardous liquid pipelines transport a greater variety of products (including petroleum, petroleum products, natural gas liquids, anhydrous ammonia, and carbon dioxide), so the risks of hazardous liquid pipeline releases vary according to the commodity involved. Releases of some commodities transported in hazardous liquid pipelines, such as propane, pose primarily an acute hazard of fire or explosion, similar to natural gas. These commodities have a high vapor pressure and are in liquid form while transported under pressure in a pipeline. However, if they are released from the pipeline, they will convert to gas as the pressure is reduced. Some of these commodities have densities greater than air, so they have a stronger propensity to remain near the ground than natural gas, which disperses more readily. The behavior of these commodities when released presents some different challenges for mitigation, compared to other hazardous liquids or natural gas.
Releases of other hazardous liquids, such as gasoline and crude oil, have both acute and more long-term potential consequences, as the released product can spread over land and water, flowing into valleys, ravines, and waterways. This can result in harmful consequences to people and to the environment, including human injuries or fatalities from fire or explosion, as well as potential ecological damage and contamination of drinking water supplies occurring some distance from the point of initial release.
Does federal law preempt local governments from applying zoning ordinances to interstate hazardous liquids pipelines?
The short answer is no, providing that the zoning ordinance is not attempting to regulate matters that are preempted by the Pipeline Safety Act and safety standards developed by the U.S. Department of Transportations Pipeline and Hazardous Materials Safety Administration.
Congress has expressly preempted state law with respect to pipeline safety in this manner:
"A State authority that has submitted a current certification under section 60105(a)of this title may adopt additional or more stringent safety standards for intrastate pipeline transportation only if those standards are compatible with the minimum standards prescribed under this chapter. A State authority may not adopt or continue in force safety standards for interstate pipeline facilities or interstate pipeline transportation[.]"
49 U.S.C. 60104(c).
In the case of Texas Midstream Gas Services LLC v. City of Grand Prairie, 608 F.3d 200 (5th Cir. 2010), the Fifth Circuit Court of Appeals was asked to determine whether an amendment to a city development code adopted after Texas Midstream Gas Services (TMGS) announced plans to construct a natural gas pipeline and compressor station to clean and compress natural gas for interstate transport, was preempted by the Pipeline Safety Act. The amended code required a setback from roads, a security fence, enclosed building for the compressor station, paved road, and noise controls.
The Court reviewed the history of the Pipeline Safety Act of 1994, (which combined and recodified without change the 1968 Natural Gas Pipeline Safety Act and the 1979 Hazardous Liquids Pipeline Safety Act), which set as its goal that of providing adequate protection against risks to life and property posed by pipeline transportation and pipeline facilities. Noting that the Act expressly preempts state safety standards for interstate pipeline facilities or interstate pipeline transportation, at 49 U.S.C. 60104(c), the Court turned to TMGSs claim that federal regulation addressed the location of compressor stations and pipeline setbacks, thus preempting the City standards.
The Court noted that Congress may preempt state or local law expressly, or by conflict preemption (directly conflicting with it) or field preemption (occupying a field so pervasively as to exclude state regulation). In the case of the PSA, because Congress had expressly preempted state safety standards, the Court would not imply any further preemption. Since the setback requirement was motivated not out of safety concerns but to preserve neighborhood cohesion, avoid eyesores and diminished property values, the Court would not void the city ordinance even though there was a federal regulation addressing setbacks for compressor stations with respect to fire risk, since a local rule may incidentally affect safety, so long as the effect is not direct and substantial. Although the local setback might require a greater distance to adjacent buildings than would the federal regulation at 49 C.F.R. 192.163, this incidental salutary effect on fire safety does not undermine Congress intent in promulgating the PSA as it is neither direct nor substantial. Id. at 211.
The District Court had apparently decided that the security fence requirement was a safety requirement preempted by the PSA, and TMGS argued that all of the remaining portions of the amended ordinance, addressing building materials, roofing, noise levels, and landscaping, were connected and should also be struck. The Court of Appeals rejected this, noting that the remaining portions were capable of being separately applied and were severable.
Other federal cases that help to illuminate the boundary between permissive local regulation and preempted activity include United Gas Pipeline Co. v. Terrebone Parish Police Jury, 319 F. Supp. 1138 (E.D. La 1970), in which an ordinance regulating the construction, installation, and operation of gas or liquid petroleum pipelines or canals in the parish, and provided for specifications, reports, permits, insurance, fees, and providing penalties for violation thereof, was found to be preempted. In a per curiam decision affirming the District Court decision, the Court of Appeals for the 5th Circuit noted that we do not hold that the Parish Police Jury cannot enact a valid ordinance requiring permits with reasonable conditions. 445 F.2d 301, 302 (5th Cir. 1971).
In the recent case of Washington Gas Light Co. v Prince George's County Council 711 F3d 412 (4th Cir. 2013), the Court of Appeals for the Fourth Circuit rejected the argument that county zoning plans came within the express preemption provision of 49 USC 60104(c).
Washington Gas Light Company("Washington Gas")operated a natural gas substation in Prince George's County, Maryland("Chillum Site"),and sought to expand that substation with the addition of a liquefied natural gas ("LNG") storage tank. When Prince George's County denied the request based on recently enacted county zoning plans, the company appealed, claiming that the ordinance was preempted by the PSA.
The county zoning plans that the company objected to, were an overlay zone and transit development plan aimed at maximizing "transit-oriented development" in the area around the West Hyattsville Metro Center, and prohibiting all industrial usage in the area that included the substation.
Noting that the county zoning plans were designed to foster transit-oriented development, to assure that all new development was pedestrian-oriented, and to enhance and protect the environment by protecting environmentally sensitive areas and minimizing the impacts of development, the Court concluded that in light of these goals, it is clear that the County Zoning Plans are primarily local land use regulations as opposed to safety regulations. Id. at. 421. Rejecting a claim that the PSA had preemptive effect beyond the express preemption provision, the Court noted that even if it agreed with the argument, it would yet not conclude that Congress intended the PSA to occupy the field of natural has facility siting, because
"Specifically, the PSA expressly circumscribes the Secretary of Transportations role in this area, indicating, [t]his chapter does not authorize the Secretary of Transportation to prescribe the location or routing of a pipeline facility. 49 U.S.C.60104(e)(2006)."
Id. at 422.
These decisions are consistent with the jurisprudence in other federal District and Circuit Courts with respect to state and local enactments. Safety ordinances and state laws attempting to govern construction, installation, inspection, and depth of interstate natural gas pipelines have been held to be preempted by the PSAs predecessor statutes, but the PSA has not been held to have preempted local zoning ordinances with respect to hazardous liquids pipelines.
Does Kentucky law preempt local government planning and zoning with respect to pipeline and related facility location?
Each states law will differ regarding the authority that local governments have with respect to the routing and location of hazardous liquids pipelines and related facilities.
In Kentucky, the General Assembly has authorized local governments to adopt comprehensive land use plans and zoning ordinances pursuant to KRS Chapter 100.
Before addressing specific approaches that have been or could be used to assure compatibility of the routing and siting of pipelines and related facilities to current land uses and future planned development, it is instructive to determine whether pipelines transporting hazardous liquids are subject to KRS Chapter 100.
KRS 353.500(2) expresses a legislative intent that governmental responsibility for regulating all aspects of oil and gas exploration, production, development, gathering, and transmission rests with state government and preempts all other non-state entities from doing so except as provided in KRS Chapter 100.
Thus, the power of local communities to plan for land use and to regulate land use through KRS Chapter 100, including use of land to support transmission lines, is thus preserved in KRS 353.500(2).
Does KRS Chapter 100 exempt natural gas liquids pipelines and other hazardous liquids pipelines from the jurisdiction of planning commissions and boards of adjustment?
Local regulation of some transmission pipelines (i.e. those owned by regulated utilities) is addressed under KRS 100.324, which provides that:
"100.324 Public utility facilities excepted -- Review of proposed acquisition,disposition, or change by commission.
(1) All other provisions of this chapter to the contrary notwithstanding, public utilities operating under the jurisdiction of the Public Service Commission, except as specified in KRS 100.987, or the Department of Vehicle Regulation or Federal Energy Regulatory Commission, any municipally owned electric system, and common carriers by rail shall not be required to receive the approval of the planning unit for the location or relocation of any of their service facilities. Service facilities include all facilities of such utilities and common carriers by rail other than office space, garage space, and warehouse space and include office space, garage space, and warehouse space when such space is incidental to a service facility. The Public Service Commission and the Department of Vehicle Regulation shall give notice to the planning commission of any planning unit of any hearing which affects locations or relocations of service facilities within that planning unit's jurisdiction.
(2) The nonservice facilities excluded in subsection (1) of this section must be in accordance with the zoning regulations.
(3) Upon the request of the planning commission, the public utilities referred to in this section shall provide the planning commission of the planning unit affected with information concerning service facilities which have been located on and relocated on private property.
(4) Any proposal for acquisition or disposition of land for public facilities, or changes in the character, location, or extent of structures or land for public facilities, excluding state and federal highways and public utilities and common carriers by rail mentioned in this section, shall be referred to the commission to be reviewed in light of its agreement with the comprehensive plan, and the commission shall, within sixty (60) days from the date of its receipt, review the
project and advise the referring body whether the project is in accordance with the comprehensive plan. If it disapproves of the project, it shall state the reasons for disapproval in writing and make suggestions for changes which will, in its opinion, better accomplish the objectives of the comprehensive plan. No permit required for construction or occupancy of such public facilities shall be issued until the expiration of the sixty (60) day period or until the planning commission issues its report, whichever occurs first."
By its plain terms, KRS 100.324(1) is limited in scope to public utilities operating under state or federal jurisdiction. The Bluegrass Pipeline Partners, LLC, for example, is not a public utility regulated by the state Public Service Commission or the Federal Energy Regulatory Commission, nor is the routing of the proposed natural gas liquids pipeline under the PSCs or the FERCs jurisdiction. Thus, approval of the planning unit for the location or relocation for all service facilities would be required.
KRS 100.324(4) provides for local planning unit review of land acquisition for public facilities other than those of public utilities and common carriers by rail. This is referred to as the community facilities review, and results in a nonbinding determination of compatibility of the proposed facility with the comprehensive land use plan.
The proposed Bluegrass Pipeline, while potentially a common carrier under federal law, is not a public facility within the meaning of KRS 100.324(4) , and is thus subject to regulation pursuant to comprehensive plans and zoning regulations adopted pursuant to KRS Chapter 100.
What approaches are available under KRS Chapter 100 for assuring that pipeline routing is consistent with locally adopted plans and codes?
KRS Chapter 100 empowers local communities to regulate land use, through the adoption of a comprehensive plan which shall serve as a guide for public and private actions and decisions to assure the development of public and private property in the most appropriate relationship.
KRS 100.183.
The comprehensive plan must include, at a minimum, a statement of goals and objectives which shall serve as a guide for the physical development and economic and social well-being of the planning unit, a land use plan element which shall show proposals for the most appropriate, desirable, and feasible patterns for the general location, character, extent, and interrelationship of the manner in which the community should use its public and private land
, a community facilities plan element, a transportation plan element, and other elements which in the judgment of the planning commission will further serve the purposes of the comprehensive plan.
The transportation plan element shall show proposals for the most desirable show proposals for the most desirable, appropriate, economic, and feasible pattern for the general location, character, and extent of the channels, routes, and terminals for transportation facilities for the circulation of persons and goods for specified times as far into the future as is reasonable to foresee. The channels, routes, and terminals may include, without being limited to, all classes of highways or streets, railways, airways, waterways; routings for mass transit trucks, etc.; and terminals for people, goods, or vehicles related to highways, airways, waterways, and railways.
Once a comprehensive plan is adopted, the planning unit may adopt zoning regulations that list the types of zones that may be used. KRS 100.202 allows a planning unit to place all property in one zone, and to address all land use proposals as conditional uses, allowing the planning commission to adopt the role of a board of zoning adjustment with respect to conditional use requests.
Unless a planning unit has taken the approach outlined in KRS 100.202, the zoning regulations will define various land use zones and uses, which must be uniform throughout the zone. The text of the zoning regulations shall also make provision for granting variances, conditional use permits, and for nonconforming uses of land and structures, and other provisions deemed necessary.
What may a city of county regulate through zoning regulations?
The activity on the land, including filling or excavation of land, removal of natural resources, and use of waterways and flood prone land;
The size, width, height, bulk, location of structures, buildings, and signs
Minimum or maximum areas, yards, and other open spaces which are to be left unoccupied, and minimum distance requirements between buildings and other structures;
Intensity of use;
Districts of special interest to the proper development of the community (including historical districts, planned business districts, planned industrial districts, conservation districts and others);
Fringe areas for each district with requirements to make it compatible with neighboring districts;
The activities and structures on the land at or near major thoroughfares, their intersections, and interchanges, and transportation arteries, bodies of water,
places having unique interest or value, flood plain areas, and other places having a special character or use affecting or affected by their surroundings.
KRS 100.203.
For land which is used for agricultural purposes, zoning regulations are limited to setbacks from roads, buildings in flood plains and flood ways, and mobile homes and other dwellings.
Is a natural gas liquids or other hazardous liquids pipeline a structure?
Yes, according to KRS 100.111(21), which defines structure as anything constructed or made, the use of which required permanent location in or on the ground or attachment to something having a permanent location in or on the ground, including buildings and signs[.]
What types of zoning processes have been adopted in other jurisdictions?
A 2004 Special Report published by the Transportation Research Board of the National Academies, titled Transmission Pipelines and Land Use: A Risk-Informed Approach, noted that
"Most local governments do not address pipeline issues. For those that do, there are few or no standards on which to base zoning ordinances and other development regulations. Some communities that have experienced pipeline incidents are implementing ordinances and other policies to reduce the perceived risks attributable to transmission pipelines, but these proposed ordinances do not appear to be based on a systematic assessment of risks and costs."
Id. at p. 4.
The Special Report noted that
"Rational land use decisions that provide appropriate physical separation between people and pipelines could reduce the risk associated with the increasing numbers of people in proximity to transmission pipelines. Possible land use techniques include, for example, establishing setbacks; regulating or prohibiting certain types of structures (such as schools, hospitals, and apartment buildings) and uses near transmission pipelines; and encouraging, through site and community planning, other types of activities and facilities (e.g., linear parks, recreational paths) within or in the vicinity of pipeline rights-of-way."
The Special Report recommended that the Office of Pipeline Safety develop risk-informed land use guidance for application by stakeholders. The guidance should address:
Land use policies affecting the siting, width, and other characteristics of new pipeline corridors;
The range of appropriate land uses, structures, and human activities compatible with pipeline rights-of-way;
Setbacks and other measures that could be adopted to protect structures that are built and maintained near pipelines; and
Model local zoning ordinances, subdivision regulations, and planning
policies and model state legislation that could be adopted for land uses near pipelines.
In response to the report, the PHMSA in 2007 helped initiate a multi-stakeholder initiative, the Pipelines and Informed Planning Alliance (PIPA), www.pipa-info.com, which produced a guidance document, titled Partnering to Further Enhance Pipeline Safety In Communities Through Risk-Informed Land Use Planning: Final Report of Recommended Practices (November 2010). PIPAs recommended practices, summarized here at http://primis.phmsa.dot.gov/comm/pipa/pipa_audience_local_government.htm?nocache=263 are focused on how to manage new development near existing pipelines rather than on routing of new pipelines so as to minimize adverse impacts on other development, other existing and projected land uses, and natural resources. Similarly, communities such as Austin, Texas have adopted zoning setbacks for new development near hazardous liquids pipelines, but do not have comparable setbacks or standards for routing of new pipelines.
Additionally, the Office of Pipeline Safety has published Building Safe Communities: Pipeline Risk and its Application To Local Development Decisions (October 2010). The report notes that:
"As additional homes, businesses, and schools are constructed and other development occurs, more people will be living, working, and shopping in the vicinity of transmission pipelines. Similarly, with increasing demand for energy, it is likely that new transmission pipelines will be constructed in areas of existing development. Because of these expected trends, local governments are increasingly required to make decisions concerning land use planning and development in the vicinity of transmission pipelines. The federal government, along with its state partner agencies, regulates the safe construction, testing, operation, and maintenance of the nations transmission pipelines. In addition, federal pipeline safety regulations include targeted regulations for inspecting and managing the integrity of pipeline segments that have the potential to impact populated and developed areas.
Permitting and routing of interstate natural gas pipelines are approved by the Federal Energy Regulatory Commission (FERC). State agencies (e.g. Public Utility Commissions) approve the permitting and routing of intrastate natural gas pipelines and hazardous liquid transmission pipelines."
Unfortunately, the assumption that a state agency, such as the Public Service Commission, approves the routing of hazardous liquids transmission pipelines in Kentucky is mistaken. While some other states, such as Minnesota, have siting requirements for such pipelines, Kentucky has not as of this writing, so that any routing regulation must come from the local government through Chapter 100.
Regulating Hazardous Liquids Pipelines Through Conditional Use Permitting
One approach to routing regulation, which has been adopted in Adams County, Colorado, is to require that pipelines obtain a conditional use permit (CUP). If you visit the countys website at
http://www.adcogov.org/index.aspx?NID=1246 and scroll down to Case # RCU2013-00034 - Front Range Pipeline, you can see the various documents, including the application and decision document, under this approach.
What is a conditional use permit? Conditional uses are those uses which may be allowed within designated zones under certain conditions. A conditional use is a use which is essential to or would promote the public health, safety, or welfare in one (1) or more zones, but which would impair the integrity and character of the zone in which it is located, unless restrictions on location, size, extent, and character of performance are imposed in addition to those imposed in the zoning regulation[.] Jurisdiction for hearing applications for a conditional use permit rests with the Board of Zoning Adjustments, unless a planning unit has acted under KRS 100.202, in which case the Planning Commission acts as the Board of Adjustment. Approvals may be conditioned on such things as time limitations, requirements that one or more things be done before the request can be initiated, and conditions of a continuing nature.
On the plus side, the conditional use process is well-understood by communities and developers alike, and allows the planning unit to identify in advance which zones may be suitable for the conditional use, and which are not. Conditions could be tailored to address and mitigate the impacts of the project in order to make the use compatible with the zone in which it is proposed to be located, addressing concerns including:
Noise and odor from aboveground pipeline operation and maintenance activities such as pump station machinery, start-up and shut-down activities, heat exchangers or other equipment emissions, relief valves, backup power generators, and other sources of noise or odor
Impacts on existing and proposed roads and other infrastructure, including water and wastewater infrastructure
Proximity to industrial areas where manufacturing processes involve storage of flammable liquids or gases, toxic chemicals, explosives, or other hazardous substances that could be compromised as a result of an accident
Proximity to institutional facilities such as schools, daycare facilities, hospitals, nursing homes, jails and prisons, and other potentially difficult to evacuate facilities. The location of the proposed pipeline should also be routed to reduce the potential of interference of the transmission pipeline operations and maintenance with these facilities, since institutional facilities may be difficult to evacuate.
Proximity to public safety and emergency response facilities
Proximity to current or planned places of mass public assembly
Proximity to cultural, historic, and natural resources of significance
Proximity to and impacts on prime or significant farmland
It also has the advantage of allowing the activity to be brought under regulation more quickly by amending the zoning regulations to include hazardous liquids transportation by pipeline among the conditional uses for which a permit is required.
The only drawback is that a community may prefer to have the matters decided at the planning commission and legislative body level, as would be the case with a rezoning.
Consultation Zones And Pre-Application Consultation
A model ordinance that was developed by PIPA and has been adopted in several communities, creates a consultation zone within which, for proposed new land uses and developments, the property developer/owner is be required to initiate consultation with the transmission pipeline operator in order to protect the transmission pipeline by promoting adequate consideration of the potential safety impacts of the proposed land use or property development on the pipeline; and to raise awareness of the potential safety impacts of the transmission pipeline on the proposed land use or development so they can be taken into account during planning and design. PIPA Report p. 26. Absent site-specific information, a standard consultation zone distance, on either side of the pipeline centerline, of 660 to 1,000 feet is suggested for hazardous liquids transmission pipelines. However, it is recommended that communities develop and utilize site-specific distances for consultation zones, based on the unique characteristics for the pipeline and the area surrounding the pipeline, such as operating pressure, pipe diameter, type of product carried and local topography. The American Petroleum Institute Recommended Practice (API RP) 1162, Public Awareness Programs for Pipeline Operators, First Edition, December 2003, includes recommendations for collaboration among pipeline operators, property owners/developers and emergency response officials that may be helpful in developing criteria for a planning area. API RP 1162 applies within 660 of a hazardous liquid pipeline.
While the consultation zone is crafted to apply to new development near existing pipelines, a consultation requirement for new hazardous liquids pipelines could be adopted as part of a countys zoning regulations, requiring that, prior to filing an application for a conditional use permit or a rezoning, the applicant provide notice to all property owners within a set distance (for example, 660 feet from proposed pipe centerline) and conduct at least one pre-application meeting with those stakeholders in order to promote adequate consideration of the potential safety impacts of the proposed land use or property development from the proposed pipeline; and to raise awareness of the potential safety impacts of the transmission pipeline on the proposed land use or development so they can be taken into account during the pipeline planning and design.
Regulating New Pipeline Routing Through Adoption of Zoning Standards
As an alternative to the use of conditional use permits, a community could amend the zoning code to identify in which zoning classifications a hazardous liquids pipeline is a permitted use with special conditions. This approach would provide less scrutiny than the conditional use process, since permitted uses with special standards typically require, at most, staff level review and approval.
The alternative that would provide the greatest level of local oversight would be to create a new hazardous liquids pipeline corridor zoning classification, requiring planning commission and legislative body approval for any proposed pipeline project. The corridor width could either be fixed by regulation or variable. The zoning classification could be limited to hazardous liquids or could include intrastate natural gas pipelines as well, since neither is subject to FERC jurisdiction with respect to the routing of a pipeline, or it could be limited to hazardous liquids pipelines, since there is a rational basis for distinguishing the two in terms of the risks posed to land and water resources from the latter as compared to the former.
Setbacks could be required in order to assure compatibility of the proposed pipeline corridor with nearby land uses in such matters as noise, impact on water resources, and impact on nearby land use and development.
While some communities have established firm setbacks of X feet, the better approach would be to establish setbacks on a project-specific basis, using accepted hazard analysis software to identify the area of potential impact in the event of a pipeline spill. The applicant would be required to submit a hazard analysis considering the volume of liquid that might be released (based on flow rates, spill detection time, pipeline shutdown time, and drain down volume), and where the spilled liquid would go (considering overland flow based on flow resistance, seepage and retention in soil, direction and speed of flow, existing drainage systems, flow barriers and fluid properties).
The zoning regulations could identify those resources that could not be within the area of potential impact, such as private, semi-public or public surface or groundwater withdrawals, wellhead protection areas, wetlands, parks, wildlife management areas, cultural or historic resources, areas of unstable geology or geography, and other areas deemed to be incompatible based on the potential for a release of hazardous liquids from a pipeline.
The standards for the new zoning classification could also address many of the issues that are mentioned above in the context of the conditional use process.
Would The Acquisition of Easements For A Contemplated Pipeline Project Qualify As A Nonconforming Use?
No. A nonconforming use or structure is defined in KRS 100.111 to mean an activity or a building, sign, structure, or a portion thereof which lawfully existed before the adoption or amendment of the zoning regulation, but which does not conform to all of the regulations contained in the zoning regulation which pertain to the zone in which it is located.
KRS 100.253 exempts as nonconforming uses only [t]he lawful use of a building or premises, existing at the time of adoption of any zoning regulations affecting it[.] The acquisition of an easement in anticipation of potentially constructing a pipeline would not make the use existing under Kentucky law. As the Court noted in Perkins v. Joint City-Council Planning Commission, Ky., 480 S.W.2d 166 (1970):
"The general rule is that for property to qualify as nonconforming use the use must have been actually demonstrated prior to the zoning ordinance. Mere contemplation of use of the property for a specific purpose is not sufficient to place it in a nonconforming-use status. Smith v. Juillerat, 161 Ohio St. 424, 119 N.E.2d 611 (1954). Nor is the purchase of the property accompanied by an intent to use it for a specific purpose sufficient. Edelstein v. Dade County, Fla. App., 171 So.2d 611 (1965). An exception to the rule recognized by many jurisdictions is where substantial construction has been made on the property or substantial expenses incurred relating directly to the construction prior to the ordinance."
Id. at 168.